To the central content area

The Inspection and Certification Third Party on Due Recycled Waste (Waste Motor Vehicles-south Region)

Absrtact
The execution results of the Project conducted by FTIS during the project executed period, April 01, 2004 to March 31, 2005, can be summarized as following: 1. Inspection and certification include certified recycled-disposal quantity execute 100% engine auditing on site of waste motor vehicle, body clearance auditing of waste motor vehicle, and factory resident auditing. certified engine quantity:70,531 cars and 167,787 motorcycles certified disposal quantity:69,223 cars and 164,379 motorcycles certified body clearance quantity:43,470,020 kg exporting verification quantity:21,243 cars and 32,169 motorcycles factory resident auditing on comminuting classifying disposal enterprises of waste motor vehicles(Green Environment Engineering Incorporation, Sun Chi Yuan E.P.T. CO., Ltd., and Gi Ho Chen Environmental Technology Co., Ltd.):disposal quantity 154,553,470 kg with certified disposal quantity 153,631,309 kg 2. Subsidy checking Totaled 14,449,654 NT dollars subsidy on waste motor vehicles of the recycling enterprises of southern Taiwan and comminuting classifying disposal enterprises nationwide is deducted for disqualified events. 3. Motor vehicles recycle and treatment system examination and reform Waste motor vehicles recycle/treatment system revision, used components reuse management mechanism plan, motor vehicle information centre operation plan, and recycle/treatment facility licensing mechanism plan have been done since December 2004.
Keyword
Body clearance auditing,Factory resident auditing,Recycling amounts and processing amounts auditing,Subsidy
Open
top